Bond Progress

2023 Gunter ISD Bond Update (High School)

- Continuation of Reinforced Concrete Pipe (RCP)
- Continuation of Storm Drainage System
- Building A – Hand Chemical Injection underway
- Sanitary Sewer lines and Box Collectors being installed

2023 Gunter ISD Bond Update (Elementary School)
- Continuation of Building Pad Processing to Final Elevation
- Continuation of Pond Grading and Ring Road Grading
- GCEC has set the meter for Construction Power